Bench Marks
…height. The height of a benchmark is calculated relative to the heights of nearby benchmarks in a network extending from a fundamental benchmark. A fundamental benchmark is a point with…
…height. The height of a benchmark is calculated relative to the heights of nearby benchmarks in a network extending from a fundamental benchmark. A fundamental benchmark is a point with…
…balcony or deck Swaying or unstable Loose, missing or rusted anchors, joist hangers, nails or screws Damaged or decayed support beams, posts or decking Inspect connection to building or structure…
…salt-treated 4″ x 4″ posts or steel open-eye posts. Materials should be degradable, and items such as stainless steel staples not used because of their prolonged endurance; long after the…
…in planning for and mitigating potential petroleum fuel spills. The location information gives first responders pertinent fuel tank location information for post-storm events, aiding damage teams in locating and assessing…
…sidewalk repairs remain at $20,000. Costs for concrete disposal are included at $12,500. Property taxes on the post office property have been included at $14,000. Building Maintenance covers maintenance for…